SPECIALITY PROJECTS
Fremont Memory Care Facility, Fremont, NE (2013)
This project is a Assisted Living facility that was situated on a very narrow lot. The lot was designed with as minimal as slope as feasible to assure elderly access all around the building with no barriers or retaining walls to impede access.
Meridian Gardens Assisted Living, Columbus, NE : Shalimar Gardens Assisted Living, Fremont, NE
Blakeman Engineering has designed several assisted living buildings. Providing flat areas for senior citizens and yet maintaining control of stormwater and ice buildup is a challenge that has been dealt with on all projects with success.
North Bend Library, North Bend, NE (2012)
This library finished construction in July 2012. The building site had to be raised up over 4 feet vertically to meet floodplain requirements and to meet FEMA flood elevation requirements. The building was located out of the 100 year floodplain yet the site still had to be ADA accessible. Blakeman Engineering was able to meet all those requirements within the site area provided. Design included all utilities, parking stalls, ADA ramps, and meeting Department of Roads criteria for construction adjacent to a Nebraska Highway.
Our Saviour's Church, Elkhorn, NE (and other churches)
Blakeman Engineering has provided engineering services for numerous churches. Projects include: Journey Christian Church in Wayne, NE, Latter-Day Saints Church in Blair, NE, St. John's Greek Orthodox Church in Omaha, NE, and Holy Name Church in Omaha, NE.